Planning guide
Building a Home on Your Own Land in Bryan–College Station: What to Check First
Owning the land is a head start, but the lot decides a lot about the house: where it sits, how it is served by water, power and sewer, and which permits apply. Here are the checks worth making before you finalize plans or close on a property.

Start with the lot, not the floor plan
A good plan fits its site. Before designing, gather what the lot already tells you: the survey, easements, setbacks, slope and drainage, existing trees and how the property is reached. College Station’s single-family permit requirements ask for a to-scale site plan showing the house location, easements, setbacks, driveways and property lines, so these details end up on paper anyway.
Find out which jurisdiction you’re in
The rules depend on whether the property is inside Bryan, inside College Station or in unincorporated Brazos County. In Bryan, building permits go through an online portal, and contractors and subcontractors register annually to apply. College Station requires all contractors to be registered with the city, and construction must start within 180 days of permit issuance or the permit can expire. Outside city limits, expect the county to handle septic permits and floodplain permits for new construction. Confirm which applies before you buy.
Check the floodplain early
FEMA’s Flood Map Service Center is the official public source for flood hazard maps, and both cities will answer property-specific questions.
- Bryan: the city makes floodplain determinations for parcels inside its limits and requires a floodplain development permit for building in the floodplain, with minimum finished floor elevations documented by elevation certificates.
- College Station: any activity in the floodplain needs a development permit, and in a special flood hazard area the finished floor must sit at least 12 inches above base flood elevation. Adding fill doesn’t by itself take a property out of the floodplain; that takes a formal map revision.
- Unincorporated county: Brazos County’s septic guide calls for a floodplain permit from the county Road & Bridge Department, or an exemption letter, before new construction begins.
Sewer or septic, electric and water
- Sewer or septic. If city sewer isn’t available, the home needs an on-site sewage facility. Under Brazos County’s septic permit guide, a TCEQ-licensed site evaluator assesses the site, a professional engineer or registered sanitarian designs the system, and a TCEQ-registered installer is named on the permit. The guide lists a $445 fee for a new residential system and says the authorization to construct is issued within 30 days of the materials being ready for review, so build that lead time into your schedule.
- Electric. If Bryan Texas Utilities serves the address, you start with its new services assistant and the property’s 911 address. A line design technician visits to review requirements, costs and any right-of-way clearing, and BTU’s line extension policy determines any contribution you owe before construction is scheduled.
- Water. Confirm who provides water at the address, and whether it means a tap or a well, before you commit to a lot.
Questions to answer before you buy or finalize plans
- Which jurisdiction is the property in, and which permits apply?
- Is any part of the lot in a floodplain, and what finished floor height does that require?
- Is city sewer available, or does the lot need a septic evaluation?
- Who provides electric and water, and what would it cost to extend service?
- Do easements, setbacks or deed restrictions limit where the house can sit, and does the neighborhood require architectural review?
- Does your builder recommend a soil or foundation investigation for this site?
Fees, timelines and rules change, so confirm details with the City of Bryan, the City of College Station or Brazos County before you rely on them.
Still looking for land?
You don’t need to own land before you talk to a builder. Golden Homes helps you understand what to look for and plans the home around the site. For lot-specific questions, Mark Golden offers a Floor Plan & Site Planning Review where you bring a floor plan, a lot or an idea and go through it together. Book a time with Mark, read how Golden Homes approaches building on your own land, or see what a custom home costs.